Our company carries out the design and construction of a production complex with an office area of 2000 m2 for the production of metal-plastic structures for the company “Glasso”. 5 months are allotted for this project. As of the beginning of March, foundations were made for the metalwork of the frame, as well as a …
Two-heat hopper
Development of drawings of the hopper, the manufacture of the hopper with its delivery to the customer’s facility.
Pallet hydraulic lift
Production of hydraulic lifts according to customer drawings.
Cooling installation of the furnace
Manufacture.
Ramp (check-in to the supermarket)
Design manufacturing and installation of steel ramp.