Our company carries out the design and construction of a production complex with an office area of 2000 m2 for the production of metal-plastic structures for the company “Glasso”. 5 months are allotted for this project. As of the beginning of March, foundations were made for the metalwork of the frame, as well as a …
SC Johnson Production Facility Construction
Development of design documentation, manufacturing and installation of metal structures of the frame, installation of wall and roofing enclosures.
Construction of transport galleries. Water Coal Plant
The device of foundations, the manufacture and installation of metal structures of the galleries frame, the device of wall and roof enclosing structures.
Construction of a workshop for the production of paints TM “Feidal”
A full range of design and construction of the expansion of the workshop.
Construction of a water coal production workshop (Kiev region)
Construction of a production building (foundations + metal frame + walls and roof).
Construction Racks for explosive materials mixture
Turnkey design and construction.
The device of the line for the supply of stone (lime) with fences
Development of design documentation for the section KMD, manufacturing and installation of metal structures of the frame with galvanized fencing.
Alternative Fuel Plant Site Fencing Device
Development of design documentation, manufacture and installation of fencing.
The device of facades on the tank (brewery “Karlsberg” Kiev)
Installation of insulated facade system.