Development of KM and CMD sections for artificial small-tonnage (up to 20 tons) structures and products | tn | from 800 | price excluding approvals |
---|---|---|---|
Development of KM and CMD sections for structures and products of medium complexity (from 20 tons) | tn | from 500 | price excluding approvals |
Development of KM and CMD sections for non-standard structures and products | k-ks | Negotiable price | price excluding approvals |
Production of small-piece metal structures (products) | pc | Negotiable price | |
---|---|---|---|
Manufacturing of medium complexity | tn | from 35,000 | Cost Based on Material Cost |
Manufacturing of heavy duty steel structures | tn | from 32,000 | Cost Based on Material Cost |
Manufacture of non-standard high-complexity metal structures | tn | from 40,000 | Cost Based on Material Cost |
Manufacture of metal structures from customer materials | tn | from 14,000 | price excluding materials and CMDs |
Making anchor bolts, studs | kg | from 70 | Material Price |
Production of mortgages, bracket | kg | from 50 | Material Price |
Lathes and Milling Works | kg | Negotiable price | depending on the complexity and quantity of the products |
Intermediate Metal assembly of medium complexity | tn | from 4,500 | No lifting mechanisms |
---|---|---|---|
Installation of metal structures , factory production, heavy duty, bolted connections | tn | from 7,000 | With hoists |
Installation of non-standard metal structures of high complexity factory production | product | Negotiable price | |
Manufacturing and installation of heavy duty steel structures at the construction site | tn | from 20,000 | cost excluding materials |
The cost of the work is determined only after inspection of the object | More information on tel .: +38 (067) 777-06-07 |
---|
Concrete Reinforced Plate Device | m3 | from 1200 | price excluding materials and cost of foundation preparation |
---|---|---|---|
Concrete grating device | m3 | from 1500 | price excluding materials and cost of foundation preparation |
Overlapping device | m3 | from 900 | cost excluding materials |
Profiled Sheet Overlay Plate | m2 | from 150 | cost excluding materials |
Monolithic column device | m3 | from 1800 | cost excluding materials |
Wall Monolithic Device | m3 | from 1800 | cost excluding materials |
Concrete coupler unit up to 6 cm | m2 | from 120 | cost excluding materials |
Installation of Decking | m2 | from 55 | cost excluding materials |
---|---|---|---|
Installation of Roof Sandwich Panels (Factory) | m2 | from 120 | cost excluding materials |
Installation of roof sandwich panels (dialed) | m2 | from 200 | cost excluding materials |
Installation of wall sandwich panels (factory) | m2 | from 120 | cost excluding materials |
Installation of Wall Sandwich Panels (dialed) | m2 | from 200 | cost excluding materials |
Mounting the skirting boards and adjacent slats | MP | from 40 | cost excluding materials |
Gutter Installation | MP | from 90 | cost excluding materials |