| Development of KM and CMD sections for artificial small-tonnage (up to 20 tons) structures and products | tn | from 800 | price excluding approvals |
|---|---|---|---|
| Development of KM and CMD sections for structures and products of medium complexity (from 20 tons) | tn | from 500 | price excluding approvals |
| Development of KM and CMD sections for non-standard structures and products | k-ks | Negotiable price | price excluding approvals |
| Production of small-piece metal structures (products) | pc | Negotiable price | |
|---|---|---|---|
| Manufacturing of medium complexity | tn | from 35,000 | Cost Based on Material Cost |
| Manufacturing of heavy duty steel structures | tn | from 32,000 | Cost Based on Material Cost |
| Manufacture of non-standard high-complexity metal structures | tn | from 40,000 | Cost Based on Material Cost |
| Manufacture of metal structures from customer materials | tn | from 14,000 | price excluding materials and CMDs |
| Making anchor bolts, studs | kg | from 70 | Material Price |
| Production of mortgages, bracket | kg | from 50 | Material Price |
| Lathes and Milling Works | kg | Negotiable price | depending on the complexity and quantity of the products |
| Intermediate Metal assembly of medium complexity | tn | from 4,500 | No lifting mechanisms |
|---|---|---|---|
| Installation of metal structures , factory production, heavy duty, bolted connections | tn | from 7,000 | With hoists |
| Installation of non-standard metal structures of high complexity factory production | product | Negotiable price | |
| Manufacturing and installation of heavy duty steel structures at the construction site | tn | from 20,000 | cost excluding materials |
| The cost of the work is determined only after inspection of the object | More information on tel .: +38 (067) 777-06-07 |
|---|
| Concrete Reinforced Plate Device | m3 | from 1200 | price excluding materials and cost of foundation preparation |
|---|---|---|---|
| Concrete grating device | m3 | from 1500 | price excluding materials and cost of foundation preparation |
| Overlapping device | m3 | from 900 | cost excluding materials |
| Profiled Sheet Overlay Plate | m2 | from 150 | cost excluding materials |
| Monolithic column device | m3 | from 1800 | cost excluding materials |
| Wall Monolithic Device | m3 | from 1800 | cost excluding materials |
| Concrete coupler unit up to 6 cm | m2 | from 120 | cost excluding materials |
| Installation of Decking | m2 | from 55 | cost excluding materials |
|---|---|---|---|
| Installation of Roof Sandwich Panels (Factory) | m2 | from 120 | cost excluding materials |
| Installation of roof sandwich panels (dialed) | m2 | from 200 | cost excluding materials |
| Installation of wall sandwich panels (factory) | m2 | from 120 | cost excluding materials |
| Installation of Wall Sandwich Panels (dialed) | m2 | from 200 | cost excluding materials |
| Mounting the skirting boards and adjacent slats | MP | from 40 | cost excluding materials |
| Gutter Installation | MP | from 90 | cost excluding materials |